Property owners and contractors use this application to request approval for utility or other work in Sterling’s public right-of-way.

What this form is

This application requests a permit for work in Sterling’s right-of-way, which must follow city standards and regulations. It asks for the work location, schedule, cost, scope, affected utilities or streets, and contractor and owner contact information. Applicants must provide a drawing, site plan, or plat map with the application. A traffic control plan is required when work may interfere with traffic flow.

Who needs it

Property owners or contractors planning work in Sterling’s right-of-way should complete this application and provide the required plans.

How to submit it

Email the completed form and required materials to [email protected] or [email protected].

About notarization

This document is signed without a notary; it has no notarized attachment, so the applicant simply signs and dates the application.

How to submit this form

  1. 1

    Download The Application

    Download the Right-of-Way Utility Permit Application.

  2. 2

    Complete The Form

    Enter the work site, schedule, cost, scope, affected areas, and owner and contractor information.

  3. 3

    Gather Required Plans

    Prepare a drawing, site plan, or plat map. Include a traffic control plan if work may interfere with traffic flow.

  4. 4

    Email The Application

    Email the completed form and required materials to [email protected] or [email protected].

Frequently asked questions

Do I need a notary for the Right-of-Way Utility Permit Application?
No. The application is signed without a notary, and it does not identify any notarized or sworn attachment.
How do I submit the Right-of-Way Utility Permit Application?
Email the completed application and required materials to [email protected] or [email protected].
What plans must accompany the application?
Provide a drawing, site plan, or plat map showing property boundaries, buildings, the proposed right-of-way work location, and a sketch of the work, including engineering plans if applicable.
When is a traffic control plan required?
Include a traffic control plan if the work will be conducted in an area that interferes with traffic flow. Attach a sketch of traffic control if required.

Need something notarized?

This Right-of-Way Utility Permit Application Form doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.