Property owners and solar contractors use this application to request a unified permit for eligible solar photovoltaic installations in Taghkanic.
What this form is
This application requests a building and/or electrical permit for an eligible solar PV installation rated at 25 kW or less. Applicants confirm the project meets the eligibility criteria and provide property, system, contractor, and electrician details. Submit the completed application with required construction documents and attachments; the permitting fee is based on system size.
Who needs it
Property owners applying for a unified solar permit for an eligible PV installation must complete the application with their solar installation company representative.
How to submit it
Submit the completed application and required attachments electronically to [email protected] or in person at 909 Route 82, Taghkanic, NY 12502. The permitting fee is based on system size and is payable by cash or check to the Town of Taghkanic.
About notarization
This document is signed without a notary; the property owner and solar installation company representative sign and date the application.
How to submit this form
- 1
Download The Application
Download the NY State Unified Solar Permit application from the Taghkanic documents page.
- 2
Complete The Application
Provide property, solar system, contractor, and electrician information, confirm eligibility, and obtain the required signatures and dates.
- 3
Gather Required Attachments
Include construction documents and required attachments for the solar PV system type being installed.
- 4
Submit To The Town
Email the completed package to [email protected] or deliver it to 909 Route 82, Taghkanic, NY 12502.
Frequently asked questions
- Do I need a notary for the NY State Unified Solar Permit?
- No. The application is signed and dated by the property owner and solar installation company representative; no notary is required.
- How do I submit the unified solar permit application?
- Email the completed application and required attachments to [email protected] or submit them in person at 909 Route 82, Taghkanic, NY 12502.
- What attachments are required with the application?
- Include the required construction documents for the solar PV system type and any required attachments. The form also calls for a diagram of an existing electrical connection when panels are on a legal accessory structure.
- Which solar projects qualify for unified permitting?
- The project must meet the listed eligibility criteria, including a rated DC capacity of 25 kW or less. The application says projects that do not qualify must use conventional permit applications.
Need something notarized?