Floodplain Development Permit Application

Property owners or their representatives use this application to request permission for proposed development in Roxbury, including construction, grading, or watercourse work.

What this form is

The application collects applicant and project details so the Local Administrator can review proposed development and determine whether it conforms to local flood damage prevention provisions. Applicants complete it before work begins and submit it in duplicate; the form lists possible plans, elevation information, and certifications the administrator may require before processing. Work cannot begin until a permit is issued, and development cannot be used or occupied until a Certificate of Compliance is issued.

Who needs it

Applicants proposing construction, alterations, grading, excavation, drainage work, or other listed development in Roxbury should complete this application.

How to submit it

Complete the applicant sections and submit the form in duplicate to the Local Administrator for review. The form says a designated fee may apply if a permit is issued.

About notarization

The applicant signs and dates this application without a notary; floodproofed structures require an engineer or architect certification, but the form does not say it must be notarized.

How to submit this form

  1. 1

    Download The Application

    Download the Floodplain Development Permit Application.

  2. 2

    Complete Applicant Sections

    Fill in the applicant and proposed development sections, provide the project location, and sign and date the application.

  3. 3

    Gather Required Documents

    Check with the Local Administrator about required plans, elevation information, or certifications before processing.

  4. 4

    Submit To The Local Administrator

    Submit the completed application in duplicate to the Local Administrator for review.

Frequently asked questions

Do I need a notary for the Floodplain Development Permit Application?
No. The applicant signs and dates this application without a notary. Floodproofed structures require an engineer or architect certification, but the form does not say it must be notarized.
How do I submit the Floodplain Development Permit Application?
Complete the applicant sections and submit the form in duplicate to the Local Administrator for review. The form says a designated fee may apply if a permit is issued.
What information does the application ask for?
It asks for applicant and project details, the project location, proposed work, and estimated cost. The Local Administrator may require supporting plans, elevation information, or certifications.
Can I start work before the permit is issued?
No. The application states that no work may start until a permit is issued.