Red Hook, NY · Dutchess County

No notary required

Lot Line Adjustment Application

Applicants use this form to provide property and ownership details for a proposed lot line adjustment to the Town of Red Hook Planning Board.

What this form is

This application collects information about a proposed lot line adjustment for the Town of Red Hook Planning Board. It asks for applicant, seller or donor, receiver, and surveyor details; parcel locations and tax map numbers; acreage before and after the change; and a project description. The applicant and, if applicable, the owner sign and date the form.

Who needs it

Applicants proposing a lot line adjustment in Red Hook provide property details and signatures on this application for Planning Board proceedings.

How to submit it

Submit the application to the Town of Red Hook Planning Board, 7340 South Broadway, Red Hook, NY 12571, or email [email protected].

About notarization

This application is signed and dated without a notary; any owner consent included is also signed and dated, with no sworn attachment stated.

How to submit this form

  1. 1

    Download The Application

    Download the Lot Line Adjustment Application PDF.

  2. 2

    Complete The Application

    Provide the requested applicant, owner, professional, property, parcel, acreage, and project information.

  3. 3

    Gather Owner Consent

    Complete an Owner Consent section for each parcel owner as needed when the applicant is neither the seller or owner nor the receiver.

  4. 4

    Sign And Date

    The applicant and, if applicable, the owner sign and date the application.

  5. 5

    Submit To The Planning Board

    Send the application to the Town of Red Hook Planning Board at its listed address or email.

Frequently asked questions

Do I need a notary for the Lot Line Adjustment Application?
No. The application calls for signatures and dates, not notarization. Any owner consent included with it is also signed and dated, with no sworn attachment stated.
How do I submit the Lot Line Adjustment Application?
Send it to the Town of Red Hook Planning Board at 7340 South Broadway, Red Hook, NY 12571, or email it to [email protected].
What information does the application request?
It asks for applicant, seller or donor, receiver, and professional surveyor or engineer information, along with parcel details, acreage, restrictions, and a description of the proposed change.
When is an Owner Consent Form required?
The application says an Owner Consent Form is required if the applicant is not the seller or donor or receiver of the land. It includes an owner consent section.

Need something notarized?

This Lot Line Adjustment Application doesn’t need a notary — but if you have another Red Hook form that does, a commissioned online notary can help.