Swimming Pool Permit Application
Avon property owners use this application to request a permit for an in-ground pool or an above-ground pool at least 12 feet in diameter.
What this form is
This application requests a Town of Avon swimming pool permit for an in-ground pool or an above-ground pool with a diameter of 12 feet or greater. It asks for owner, contractor, property, pool, drainage, fencing, equipment, insurance, and project-cost details. Applicants must include a plot plan and two complete sets of construction plans; work must not begin before the permit is issued.
Who needs it
Property owners planning an in-ground pool or an above-ground pool at least 12 feet in diameter need to apply for this permit.
How to submit it
Complete two copies and submit them to the Code Enforcement Office. Include a plot plan and two complete sets of plans showing the proposed construction.
About notarization
This application is signed and dated without a notary; it does not identify any attachment or related step that must be notarized or sworn.
How to submit this form
- 1
Download The Application
Download the Swimming Pool Permit Application PDF.
- 2
Complete Two Copies
Fill in two copies with the owner, property, pool, construction, insurance, and project information requested.
- 3
Gather Required Plans
Prepare a plot plan and two complete sets of plans showing the proposed construction.
- 4
Submit To The Code Enforcement Office
Submit both completed copies and the required plans to the Code Enforcement Office.
Frequently asked questions
- Who needs the Avon Swimming Pool Permit Application?
- The form applies to all in-ground swimming pools and above-ground swimming pools with a diameter of 12 feet or greater.
- What must I include with the application?
- Submit a plot plan showing the pool, buildings, streets or areas, and property layout, plus two complete sets of plans describing the proposed construction.
- How do I submit the swimming pool permit application?
- Complete two copies and submit them with the required plot plan and two sets of construction plans to the Code Enforcement Office.
- Do I need a notary for the Swimming Pool Permit Application?
- No. This application is signed and dated without a notary, and it does not identify any attachment or related step that must be notarized or sworn.
Need something notarized?
This Swimming Pool Permit Application doesn’t need a notary — but if you have another Avon form that does, a commissioned online notary can help.