Lima, NY · Livingston County

No notary required

Pool Permit Application

Property owners or pool installers use this application to request a permit for a pool, hot tub, or spa in the Town or Village of Lima.

What this form is

The application requests a pool permit for pools capable of containing water at least 24 inches deep, including hot tubs and above-ground and in-ground pools. It asks for property, owner, installer, insurance, and pool details. Applicants must include a property map or survey showing structures, the proposed pool location, and property-line setbacks, plus a description of the pool.

Who needs it

Property owners or pool installers planning a qualifying pool in the Town or Village of Lima must submit the application before construction.

How to submit it

Mail or deliver the application to 7329 East Main Street, Lima, NY 14485. Make checks payable to the Village of Lima or Town of Lima.

About notarization

This document is signed and dated without a notary; it does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Pool Permit Application for the Town or Village of Lima.

  2. 2

    Complete The Application

    Fill in the property, owner, installer, insurance, and pool information requested.

  3. 3

    Gather Required Documents

    Include a property map or survey showing structures, the proposed pool, and setbacks, plus a description of the pool.

  4. 4

    Submit To Lima

    Mail or deliver the application to 7329 East Main Street, Lima, NY 14485. Make checks payable to the Village of Lima or Town of Lima.

Frequently asked questions

Do I need a notary for the Pool Permit Application?
No. The application is signed and dated without a notary, and it does not identify any attachment or related step that must be notarized or sworn.
How do I submit the Pool Permit Application?
Mail or deliver the application to 7329 East Main Street, Lima, NY 14485. Make checks payable to the Village of Lima or Town of Lima.
What should I include with the application?
Include a tape location map or instrument survey showing structures, the proposed pool, and property-line setbacks, along with a description of the pool, including its size and type of material.
When is a pool permit required in Lima?
The instructions say pools capable of containing water at least 24 inches deep, whether installed in, on, or above ground, require a permit in the Town or Village of Lima.

Need something notarized?

This Pool Permit Application doesn’t need a notary — but if you have another Lima form that does, a commissioned online notary can help.