East Bloomfield, NY · Ontario County
Application for Installation of Town Water
Property owners or applicants use this application to request installation of town water and provide site and contractor details.
What this form is
This application requests installation of town water and collects the applicant’s contact information, site details, water line diameter, and contractor information. It requires a site plan showing the proposed line location and exact measurements. Work cannot begin until Town and Village approvals are obtained; the application also explains inspection requirements and the installation cost and payment terms.
Who needs it
Anyone requesting town water installation should complete this application and provide the required site plan before work begins.
How to submit it
Submit the application to the Town of East Bloomfield at P.O. Box 85, 99 Main Street, East Bloomfield, New York 14443, with a site plan showing the proposed water line location and exact measurements.
About notarization
This application is signed without a notary; the applicant signs and dates it, and no notarized or sworn attachment is mentioned.
How to submit this form
- 1
Download The Application
Download the Town Water Installation Application PDF.
- 2
Complete The Application
Fill in applicant and site details, select the residential or commercial option, and provide water line and contractor information.
- 3
Gather The Site Plan
Attach a site plan identifying the proposed water line location and exact measurements.
- 4
Submit To The Town
Send the application and site plan to the Town of East Bloomfield at the address printed on the form.
Frequently asked questions
- Do I need a notary for the water installation application?
- No. The applicant signs and dates this application; it does not require a notary, and no notarized or sworn attachment is mentioned.
- How do I submit the water installation application?
- Submit the completed application and a site plan showing the proposed water line location and exact measurements to the Town of East Bloomfield at the address printed on the form.
- What must I include with the application?
- Include a site plan identifying the proposed water line location with exact measurements. The application also asks for applicant, site, water line, and contractor information.
- Can work start as soon as I submit the application?
- No. The form says work cannot begin until approvals are obtained from the Town of East Bloomfield and the Village of Bloomfield Superintendent of Public Works.
