Property owners use this application to request approval for utility or construction work in a City of Geneva right-of-way.

What this form is

This application requests a permit for utility or construction work in a City of Geneva right-of-way. It asks for the property owner’s contact details, work type and location, completion date, contractor information, and estimated cost. Applicants must also provide a construction schedule, work and trench drawings, construction details, and an insurance certificate naming the City as certificate holder.

Who needs it

A property owner requesting utility or construction work in a City of Geneva right-of-way needs this application and its listed attachments.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

The property owner signs and dates this application without a notary; the listed drawings, construction schedule, and insurance certificate are attachments, with no sworn step stated.

How to submit this form

  1. 1

    Download The Application

    Download the City Right-of-Way Permit application PDF.

  2. 2

    Complete The Application

    Fill in the property owner, work, contractor, completion date, and estimated cost information.

  3. 3

    Gather Required Attachments

    Prepare the construction schedule, work drawing, trench and construction details, and required insurance certificate.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the City Right-of-Way Permit application request?
It requests approval for utility or construction work in a City of Geneva right-of-way and collects property owner, work, contractor, and estimated cost details.
What attachments are required?
Provide a construction schedule, a drawing showing the work’s exact dimensions and location, trench details, construction details for compaction and traffic control, and an insurance certificate naming the City as certificate holder.
Do I need a notary for the City Right-of-Way Permit application?
No. The property owner signs and dates the application without a notary. The listed drawings, construction schedule, and insurance certificate are attachments; the form does not state a sworn step.
How do I submit the City Right-of-Way Permit application?
The form does not give a submission address or method. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This City Right-of-Way Permit doesn’t need a notary — but if you have another Geneva form that does, a commissioned online notary can help.