Goshen, NY · Orange County

No notary required

NY State Unified Solar Permit Application

Property owners and solar contractors use this application to request a building and/or electrical permit for an eligible solar photovoltaic installation in Goshen.

What this form is

This application is for eligible solar photovoltaic installations rated at 25 kW DC or less. Applicants confirm the project meets the unified permitting criteria and provide property, system, contractor, and electrician details. The application package also requires construction documents and any applicable attachments; projects that do not meet the criteria must use conventional permit applications.

Who needs it

Property owners applying for an eligible solar PV installation and their solar installation company representatives complete and sign this application.

How to submit it

Submit the completed application and required construction documents in person or by mail to 276 Main Street, Goshen, NY 10924.

About notarization

This application is signed and dated without a notary; the property owner and solar installation company representative sign it.

How to submit this form

  1. 1

    Download The Application

    Download the NY State Unified Solar Permit Application.

  2. 2

    Complete And Sign

    Confirm project eligibility and complete the property, system, contractor, and electrician sections. The property owner and company representative sign and date it.

  3. 3

    Gather Required Documents

    Attach construction documents and the required supporting materials for the proposed solar PV system.

  4. 4

    Submit To Goshen

    Submit the completed application package in person or by mail to 276 Main Street, Goshen, NY 10924.

Frequently asked questions

Do I need a notary for the NY State Unified Solar Permit Application?
No. The property owner and solar installation company representative sign and date this application without a notary.
How do I submit the solar permit application?
Submit the completed application and required construction documents in person or by mail to 276 Main Street, Goshen, NY 10924.
Which solar projects can use this application?
The unified process is for solar PV systems rated at 25 kW DC or less that meet the eligibility criteria listed on the application.
What documents must accompany the application?
Include construction documents for the solar PV system type and their required attachments. Roof-mounted systems also have roof-plan requirements.

Need something notarized?

This NY State Unified Solar Permit Application doesn’t need a notary — but if you have another Goshen form that does, a commissioned online notary can help.