Stillwater, NY · Saratoga County
Energy Storage System Operating Permit Application
Property owners or applicants use this application to request an operating permit for an energy storage system in the Village of Stillwater.
What this form is
The application collects applicant and property owner contact details, the system’s location and type, its quantities, and information about its management and monitoring. Attachments A through E are required for all applications; Attachment F is required for mobile energy storage systems. The form states that an inspection is required before an operating permit is issued.
Who needs it
Applicants seeking an operating permit for an energy storage system in the Village of Stillwater must complete this application and provide the required attachments.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the property owner signs the permission letter in Attachment D, and no notarized or sworn attachment is specified.
How to submit this form
- 1
Download The Application
Download the Energy Storage System Operating Permit Application PDF.
- 2
Complete The Application
Provide applicant, property owner, system location, system type, quantity, management, and monitoring information.
- 3
Gather Required Attachments
Include Attachments A through E. Add Attachment F for a mobile energy storage system application.
- 4
Submit The Application
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the energy storage permit application?
- No. The application has no notary block. The property owner signs the permission letter in Attachment D; no notarized or sworn attachment is specified.
- How do I submit the energy storage permit application?
- Submit it to the city department named on the form; check the city website for current contact details.
- What attachments are required?
- Attachments A through E must be submitted with all applications. Attachment F must also be submitted for a mobile energy storage system permit application.
- Is an inspection required before the permit is issued?
- Yes. The application notice states that an inspection is required for all operating permits before issuance.
Need something notarized?
This Energy Storage System Operating Permit Application doesn’t need a notary — but if you have another Stillwater form that does, a commissioned online notary can help.
