Application for Work to an Existing Pressure Building Sewer

Property owners use this application to request Town of Milo approval for work involving an existing pressure building sewer and provide billing, lot, and sewer details.

What this form is

This application requests Town approval for work to an existing pressure building sewer and records the owner’s billing details, lot information, proposed sewer diameter and material, and intended use. The document says to submit a completed application for a new building sewer with the applicable fee, a sewer easement if applicable, and the lot owner’s signature. Town operators must inspect the installation before backfilling.

Who needs it

A lot owner requesting Town of Milo approval for building sewer work and public wastewater service should complete and submit this application.

How to submit it

Submit the completed application to the Town of Milo Department of Sewer and Water, 1991 Second Milo Road, Penn Yan, New York 14527. Include the applicable fee and a sewer easement if applicable.

About notarization

This document is signed and dated by the owner without a notary; it does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Application for Work to an Existing Pressure Building Sewer.

  2. 2

    Complete The Owner And Sewer Details

    Enter the owner’s billing information, lot details, and building sewer information.

  3. 3

    Gather Required Items

    Include the applicable fee and a sewer easement if applicable.

  4. 4

    Sign And Submit To The Town

    Sign and date the application, then submit it to the Town of Milo Department of Sewer and Water.

Frequently asked questions

Do I need a notary for the pressure building sewer application?
No. The owner signs and dates the application; it does not identify any attachment or related step that must be notarized or sworn.
How do I submit the pressure building sewer application?
Submit it to the Town of Milo Department of Sewer and Water at the address on the form. Include the applicable fee and a sewer easement if applicable.
What information does the application ask for?
It asks for the owner’s billing information, lot address and tax map identification numbers, building sewer diameter and material, intended use, and the owner’s signature and date.
When must the sewer installation be inspected?
The document says Town operators must inspect the building sewer, grinder pump, and appurtenances before backfilling.

Need something notarized?

This Application for Work to an Existing Pressure Building Sewer doesn’t need a notary — but if you have another Milo form that does, a commissioned online notary can help.