Angleton, TX · Brazoria County

No notary required

Utility Right-of-Way Permit Application

Utility contractors and other right-of-way users use this application to request permission for work in City of Angleton rights-of-way.

What this form is

The application is for utility work or excavation in City of Angleton rights-of-way, after the user completes right-of-way registration. It asks for company and contact details, work dates and location, utility type, excavation method, and lane-closure and subcontractor information. Applicants must include construction or site plans, proof of liability insurance, and, for lane or roadway closures, a traffic control plan; the instructions also list other review items.

Who needs it

A registered right-of-way user or utility contractor planning work or excavation in a City of Angleton right-of-way needs this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. Include the required plans, insurance proof, and other applicable items listed in the instructions.

About notarization

This application is signed and dated without a notary; the instructions require supporting items, but do not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download the Application

    Download the Utility Right-of-Way Permit Application PDF.

  2. 2

    Complete the Application

    Enter company, contact, work location, dates, utility, excavation, lane-closure, and subcontractor details, then sign and date.

  3. 3

    Gather Required Items

    Include construction or site plans and liability insurance proof; add a traffic control plan if requesting a lane or roadway closure.

  4. 4

    Submit to the City

    Submit the application and applicable items to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Utility Right-of-Way Permit Application?
No. The application has applicant signature and date fields but no notary block. The instructions do not identify any notarized or sworn attachment or step.
How do I submit the Utility Right-of-Way Permit Application?
Submit it to the city department named on the form and check the city website for current contact details. Include the plans, insurance proof, and other applicable items listed in the instructions.
What should I include with the application?
The instructions call for construction or site plans and proof of liability insurance. Include a traffic control plan when requesting a lane closure, and review the form's office-use checklist for other applicable items.
Do I need to register before applying?
Yes. The instructions say users and occupants performing work or excavation in City rights-of-way must register as a contractor before completing and submitting the permit application.

Need something notarized?

This Utility Right-of-Way Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.