Flower Mound, TX · Denton County

No notary required

Energy Storage Systems Application

This permit application is for contractors or businesses proposing an energy storage system installation, addition, replacement, or relocation in Flower Mound.

What this form is

Use this application to request a Flower Mound permit for an energy storage system installation, addition, replacement, or relocation. It asks for the project address, permit number, business and contractor details, contact information, and work description. The form also lists required plans and specification sheets or calculations, and calculates the permit fee at $100 per system for new installations.

Who needs it

A contractor or business proposing an energy storage system installation, addition, replacement, or relocation in Flower Mound needs this application.

How to submit it

Submit it to the Fire Marshal’s Office, 3911 South Broadway Avenue, Flower Mound, Texas 75028, with the permit application fee shown on the form.

About notarization

This document is signed and dated without a notary; it lists plans and specification sheets or calculations as attachments, but does not say they must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Energy Storage Systems permit application PDF.

  2. 2

    Complete The Form

    Select the project type and fill in the project, business, contractor, contact, and work description fields.

  3. 3

    Gather Required Materials

    Include three sets of plans and specification sheets or calculations, as listed for each project type.

  4. 4

    Submit To The Fire Marshal’s Office

    Submit the application and fee to the Fire Marshal’s Office at 3911 South Broadway Avenue, Flower Mound, Texas 75028.

Frequently asked questions

What is the Energy Storage Systems application for?
It is a permit application for an energy storage system installation, addition, replacement, or relocation in Flower Mound.
What must I include with the application?
The form lists plans (three sets) and specification sheets or calculations for each project type. A scope of work is marked not applicable for all listed types.
Do I need a notary for the Energy Storage Systems application?
No. The document is signed and dated without a notary. It lists plans and specification sheets or calculations as attachments, but does not say they must be notarized or sworn.
How do I submit the Energy Storage Systems application?
Submit it to the Fire Marshal’s Office at 3911 South Broadway Avenue, Flower Mound, Texas 75028, with the permit application fee shown on the form.

Need something notarized?

This Energy Storage Systems Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.