Little Elm, TX · Denton County

No notary required

Commercial Energy Code Compliance Form

This combined form documents commercial energy-code plan review and inspection compliance for property owners and professionals submitting materials for a Little Elm project.

What this form is

This combined form documents commercial energy-code plan review and inspection compliance for a property in Little Elm. It applies to the 2018 International Energy Conservation Code and asks for selected compliance methods, property and company details, credentials, signatures, dates, and supporting reports; the inspection report must be available onsite for Building Final inspection.

Who needs it

Property owners and the professionals preparing or inspecting commercial projects use this form to document energy-code compliance.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. The inspection report must be onsite for Building Final inspection.

About notarization

This form is signed and dated without a notary; the plan review form requires an attached compliance report and a preliminary commissioning report before Building Final.

How to submit this form

  1. 1

    Download The Form

    Download the Commercial Energy Code Compliance Form PDF for the project.

  2. 2

    Complete The Form

    Enter the property, company, credential, signature, and date details, and select the applicable compliance methods.

  3. 3

    Gather Compliance Reports

    Attach the plan review compliance report and provide the preliminary commissioning report before Building Final.

  4. 4

    Submit To The City

    Submit the form to the city department named on it; keep the inspection report onsite for Building Final inspection.

Frequently asked questions

What does the Commercial Energy Code Compliance Form document?
It records commercial energy-code plan review and inspection compliance, including selected compliance methods, property and company details, credentials, signatures, and supporting reports.
Do I need a notary for the Commercial Energy Code Compliance Form?
No. The form has no notary block; the signer signs and dates it. The plan review form requires a compliance report attachment and a preliminary commissioning report before Building Final.
How do I submit the Commercial Energy Code Compliance Form?
Submit it to the city department named on the form and check the city website for current contact details. The inspection report must be onsite for Building Final inspection.

Need something notarized?

This Commercial Energy Code Compliance Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.