Midlothian, TX · Ellis County

No notary required

Trip Generation Threshold Analysis Worksheet

A licensed professional engineer completes this worksheet to report a development’s proposed land use and estimate its trip generation for the City of Midlothian.

What this form is

The City uses this worksheet to assess whether a development is expected to meet the stated thresholds for requiring a Traffic Impact Analysis (TIA). A licensed professional engineer with transportation engineering experience completes it using the most recent ITE Trip Generation Manual. It asks for development details, land use and trip-generation data, and the preparer’s contact information and signature.

Who needs it

A licensed professional engineer with transportation engineering experience completes the worksheet for a development being reviewed by the City of Midlothian.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the engineer completing it provides a seal, signature, and date, and no notarized attachment or related step is specified.

How to submit this form

  1. 1

    Download The Worksheet

    Download the Trip Generation Threshold Analysis Worksheet PDF.

  2. 2

    Complete Development Details

    Enter the submittal date, development name, approximate location, and proposed land use and trip-generation data.

  3. 3

    Provide Engineer Information

    Have a qualified licensed professional engineer complete the worksheet, provide contact information, and add a seal, signature, and date.

  4. 4

    Submit To The City

    Submit the completed worksheet to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Trip Generation Threshold Analysis Worksheet?
No. The worksheet has no notary block. The completing engineer provides a seal, signature, and date; no notarized attachment or related step is specified.
How do I submit the Trip Generation Threshold Analysis Worksheet?
The worksheet does not give a submission address or portal. Submit it to the city department named on the form; check the city website for current contact details.
Who completes the worksheet?
It must be completed by a licensed professional engineer with experience in transportation engineering. The engineer provides contact information, a seal, signature, and date.
When does the worksheet indicate that a TIA is required?
It says a TIA is required when a development is expected to generate 500 or more vehicle trips per day, or 50 or more trips in the peak direction during the site's peak traffic hour.

Need something notarized?

This Trip Generation Threshold Analysis Worksheet doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.