Tyler, TX · Smith County

No notary required

Approval for Construction at Lake Tyler and Lake Tyler East

Property owners submit this application to seek City of Tyler Utilities Division approval for construction at Lake Tyler or Lake Tyler East.

What this form is

Use this application for proposed construction at Lake Tyler or Lake Tyler East, including work on a residence, lot, boathouse, pier, or boathouse plumbing. The form asks for property, owner, contractor, construction, and survey details, and requires a plat copy; septic-related work may require an additional signed permit application. The instructions also require an administrative handling fee with the initial submittal.

Who needs it

A property owner proposing construction at Lake Tyler or Lake Tyler East needs this application for Utilities Division approval.

How to submit it

Submit the form with the required fee; the instructions say payment must accompany the initial submittal. The form does not provide a submission address, so check the city website for current contact details.

About notarization

This document is signed and dated without a notary; the signer just signs and dates it, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Application

    Download the Lake Tyler construction approval application PDF.

  2. 2

    Complete The Form

    Enter the property, owner, contractor, proposed construction, and survey information, then sign and date the form.

  3. 3

    Gather Attachments

    Attach a plat copy showing lot dimensions and, if applicable, the signed septic-system permit application.

  4. 4

    Submit To The City

    Send the form with the required fee; check the city website for current submission contact details.

Frequently asked questions

What is the Lake Tyler construction approval application for?
It is used to request Utilities Division approval for proposed construction at Lake Tyler or Lake Tyler East, including residences, lots, boathouses, piers, and boathouse plumbing.
What should I attach to the application?
Attach a copy of the plat showing lot dimensions. If the construction involves installing or repairing a septic system, attach a copy of the signed application for a permit to construct an on-site sanitary sewage disposal system.
Do I need a notary for the Lake Tyler construction approval application?
No. This document is signed and dated without a notary. The instructions identify a signed septic-system permit application as an attachment when applicable, but do not say it must be notarized.
How do I submit the Lake Tyler construction approval application?
Submit the form with the required fee, which the instructions say must accompany the initial submittal. The form gives no submission address; check the city website for current contact details.

Need something notarized?

This Approval for Construction at Lake Tyler and Lake Tyler East doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.