This plan records construction waste and recycling details for property owners or contractors submitting a building permit application in San Clemente.

What this form is

The Waste Management Plan records project details, anticipated construction materials, estimated amounts, and where recyclable material will be taken. San Clemente requires the information with each building permit application. The form also includes a certification signed by the contractor or property owner; after the project is complete, a Recycling Summary and recycling trip tickets must be submitted.

Who needs it

Property owners or contractors applying for a building permit must complete and submit this plan with the application.

How to submit it

Submit the completed plan with each building permit application. After project completion, submit the Recycling Summary with recycling trip tickets to Environmental Programs at 380 Ave. Pico, #N, San Clemente, CA 92672, or fax it to (949) 361-8234.

About notarization

This plan has no notary block; the contractor or property owner signs and dates it, and later submits a Recycling Summary with recycling trip tickets.

How to submit this form

  1. 1

    Download The Plan

    Download the Waste Management Plan PDF.

  2. 2

    Complete The Project Details

    Provide owner, contractor, and project information, plus estimated construction materials and recycling or reuse details.

  3. 3

    Sign And Date

    The contractor or property owner signs and dates the certification.

  4. 4

    Submit To The City

    Submit the plan with the building permit application. After project completion, send the Recycling Summary with recycling trip tickets to Environmental Programs.

Frequently asked questions

Do I need a notary for the Waste Management Plan?
No. The plan has no notary block; the contractor or property owner signs and dates it. The later Recycling Summary and trip tickets are not identified as notarized.
How do I submit the Waste Management Plan?
Submit it with each building permit application. After the project is complete, send the Recycling Summary and recycling trip tickets to Environmental Programs at the listed address or fax number.
What information does the plan ask for?
It asks for owner, contractor, and project details, anticipated materials removed, estimated amounts, feasible recycling or reuse amounts, and the location where material will be recycled.

Need something notarized?

This Waste Management Plan doesn’t need a notary — but if you have another San Clemente form that does, a commissioned online notary can help.