Utility Release Request Form

Residential single-family and duplex property owners and primary contractors use this form to request gas and electric utility release before final building sign-off.

What this form is

This form requests early release of gas and electric utilities for residential single-family or duplex construction before the certificate of occupancy is issued. The City allows release after building inspector approval and before final building sign-off. It asks for building, property, owner, and contractor details, and requires signatures from both the property owner and primary contractor.

Who needs it

Owners and primary contractors for residential single-family or duplex construction may use this form when requesting utility release before final building sign-off.

How to submit it

Email the completed form to [email protected] or deliver it to the permit center at Cupertino City Hall, 10300 Torre Ave, Cupertino, CA 95014. Schedule a Gas Meter Release and/or Electric Meter Release inspection; a Gas Test inspection is required before or with the Gas Meter Release inspection.

About notarization

This form is signed and dated by the owner and contractor without a notary; it mentions no notarized or sworn attachment or related step.

How to submit this form

  1. 1

    Download the Form

    Download the Utility Release Request Form for residential single-family or duplex construction.

  2. 2

    Complete the Form

    Provide the building, property, owner, and contractor information requested.

  3. 3

    Get Required Signatures

    Have both the property owner and primary contractor sign and date the form.

  4. 4

    Submit to the City

    Email the form to [email protected] or deliver it to the permit center at Cupertino City Hall.

Frequently asked questions

Do I need a notary for the Utility Release Request Form?
No. The owner and primary contractor sign and date this form; it lists no notarized or sworn attachment or related step.
How do I submit the Utility Release Request Form?
Email it to [email protected] or deliver it to the permit center at Cupertino City Hall, 10300 Torre Ave, Cupertino, CA 95014.
Who can request early utility release?
The form is for residential single-family or duplex construction. Both the property owner and primary contractor must sign it.
What inspection is required for gas meter release?
A Gas Test inspection is required before or at the same time as the Gas Meter Release inspection.