Windsor, CA · Sonoma County

No notary required

Submittal Requirements Checklist for Permitting of Electric Vehicle Charging Stations

Windsor’s checklist helps property owners and contractors organize plans and supporting documents for an electric vehicle charging station building permit.

What this form is

Submit one completed checklist with a completed Town of Windsor Building Permit application for a proposed electric vehicle charging station. It asks applicants to identify the charging station type and confirm that required plans, electrical load calculations, manufacturer details, and other applicable items are included or shown on the plans. Requirements vary with the installation, and the checklist asks for an explanation when an item is not completed or met.

Who needs it

Property owners and contractors seeking a building permit for an electric vehicle charging station in Windsor should complete and submit this checklist.

How to submit it

Submit the checklist with the Building Permit application to the Building Division in person at Town Hall, 9291 Old Redwood Highway, Building 400, or by email to [email protected]. Fees are due before permit issuance.

About notarization

This document is signed without a notary; the checklist asks the person completing it to sign, and it does not identify a notarized or sworn attachment.

How to submit this form

  1. 1

    Download The Checklist

    Download the EV charging station permit submittal checklist.

  2. 2

    Complete The Checklist

    Identify the proposed charging station type and mark applicable requirements; explain any checklist item not completed or met.

  3. 3

    Gather Required Materials

    Prepare the Building Permit application, plans, and applicable supporting documents listed in the checklist.

  4. 4

    Submit To The Building Division

    Submit one completed checklist with the Building Permit application in person at Town Hall or by email to [email protected].

Frequently asked questions

What is the EV charging station permit checklist for?
It helps applicants check required permit information, plans, electrical calculations, and supporting documents for an electric vehicle charging station installation.
How do I submit the EV charging station checklist?
Submit one completed copy with the Building Permit application to the Building Division in person at Town Hall, 9291 Old Redwood Highway, Building 400, or by email to [email protected].
Do I need a notary for the EV charging station checklist?
No. The checklist asks the person completing it to sign and does not identify a notarized or sworn attachment.
What documents and plans go with the checklist?
The document calls for a Building Permit application, plans, manufacturer installation details and specifications, and electrical service load calculations. Applicable items depend on the installation.

Need something notarized?

This Submittal Requirements Checklist for Permitting of Electric Vehicle Charging Stations doesn’t need a notary — but if you have another Windsor form that does, a commissioned online notary can help.