Ballston, NY · Saratoga County
Wastewater System (Septic) Permit Application
This application is for property owners or contractors seeking a permit for a new, replacement, or decommissioned wastewater system in Ballston.
What this form is
Use this application to request a permit for a new, replacement, or decommissioned wastewater system. It asks for the site address, tax map ID, applicant and property owner contact details, water supply, and system design information. For new or replacement systems, submit two sets of plans designed by a licensed professional, a plot plan, and contractor insurance documents or the specified homeowner documents.
Who needs it
Property owners, contractors, or applicants seeking a permit for a new, replacement, or decommissioned wastewater system in Ballston need this application.
How to submit it
Submit the application and required materials to the Building Department, 323 Charlton Road, Ballston Spa, NY 12020. The form lists [email protected] as the department email.
About notarization
This application is signed and dated without a notary; it also lists a homeowner affidavit of exemption from workers’ compensation as an insurance document.
How to submit this form
- 1
Download The Application
Download the Wastewater System (Septic) Permit Application.
- 2
Complete The Application
Provide the site, applicant, property owner, water supply, and system information requested on the form.
- 3
Gather Required Materials
For a new or replacement system, include the plans, plot plan, and contractor or homeowner insurance documents listed on the application.
- 4
Submit To The Building Department
Send the application and required materials to the Building Department at 323 Charlton Road, Ballston Spa, NY 12020.
Frequently asked questions
- Do I need a notary for the Wastewater System (Septic) Permit Application?
- No. The application has signature and date fields but no notary block. It lists a homeowner affidavit of exemption from workers’ compensation as an insurance document.
- How do I submit the septic permit application?
- Submit it to the Building Department at 323 Charlton Road, Ballston Spa, NY 12020. The form also lists [email protected].
- What materials are required for a new or replacement septic system?
- The form requests two sets of plans designed by a licensed professional, a plot plan showing the proposed system and other structures, and contractor insurance documents or the specified homeowner documents.
Need something notarized?
This Wastewater System (Septic) Permit Application doesn’t need a notary — but if you have another Ballston form that does, a commissioned online notary can help.
