Weston, TX · Collin County

No notary required

Application for Subdivision or Development Review Within City Limits/ETJ

Developers use this application to request review of a subdivision or development located within city limits or the ETJ.

What this form is

This application collects project details, including the location, lot count and size, water wells, proposed on-site sewage facilities, and development company and site evaluator contacts. The application requires a complete packet of listed plans, maps, evaluations, reports, an electronic plat copy, and a $150 check payable to Collin County. Incomplete applications or packets will be returned for corrections.

Who needs it

A development company seeking subdivision or development review within city limits or the ETJ should complete and submit this application with all required documents.

How to submit it

Submit the completed application and all required documents to Collin County Development Services, with a $150 check payable to Collin County. The form states that incomplete packets will be returned.

About notarization

This application is signed without a notary; it lists no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the subdivision or development review application PDF.

  2. 2

    Complete The Application

    Fill in the city or ETJ, project details, lot information, water wells, sewage facilities, and company and site evaluator contacts.

  3. 3

    Gather Required Documents

    Include every item on the checklist, including plans, maps, evaluations, reports, an electronic plat copy, and the required check.

  4. 4

    Submit The Packet

    Submit the completed application and all required documents to Collin County Development Services.

Frequently asked questions

What does this application request?
It requests review of a subdivision or development within city limits or the ETJ and asks for project, company, site evaluator, water well, and sewage facility details.
What documents must accompany the application?
The checklist calls for site and topographical plans, floodplain information, site evaluations, water well locations, sewage facility and drainage materials, an electronic plat copy, and a $150 check payable to Collin County.
Do I need a notary for this application?
No. The application has no notary block and lists no notarized or sworn attachment; the signer just signs and dates it.
How do I submit the application?
Submit the completed application and every required document to Collin County Development Services, along with a $150 check payable to Collin County. Incomplete packets will be returned.

Need something notarized?

This Application for Subdivision or Development Review Within City Limits/ETJ doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.