Friendswood, TX · Galveston County
Right-of-Way Construction Permit
Contractors use this permit form to request approval for construction work in Friendswood’s right-of-way and provide project, owner, and contractor details.
What this form is
The Right-of-Way Construction Permit is for contractors planning construction in Friendswood’s right-of-way. The form requests facility locations, owner and contractor contact information, work dates, and scope. The completed application must include scaled engineering plans, construction details, and other applicable permit copies; incomplete applications will not be reviewed. The permit also lists utility-locate requirements and right-of-way construction standards.
Who needs it
Contractors planning right-of-way construction in Friendswood need this permit and must register with the Engineering Department and provide proof of insurance.
How to submit it
Submit the completed form to [email protected]. Include the required engineering plans and other applicable attachments; incomplete permit applications will not be reviewed.
About notarization
This document is signed and dated without a notary; the owner’s representative signs the permit, and no notarized or sworn attachment is mentioned.
How to submit this form
- 1
Download The Permit
Download the Right-of-Way Construction Permit PDF.
- 2
Complete The Form
Provide facility, owner, contractor, insurance, contact, schedule, and scope-of-work information.
- 3
Gather Required Attachments
Include scaled engineering plans and the other required construction details and applicable permit copies.
- 4
Submit To The City
Email the completed form and attachments to [email protected].
Frequently asked questions
- Do I need a notary for the Right-of-Way Construction Permit?
- No. The permit is signed and dated without a notary; the owner’s representative signs it, and the document does not mention a notarized or sworn attachment.
- How do I submit the Right-of-Way Construction Permit?
- Email the completed form to [email protected]. Include the required engineering plans and other applicable attachments; incomplete applications will not be reviewed.
- What attachments are required with the permit application?
- Include scaled engineering plans with a north arrow on each sheet, specified facility and construction details, protection methods for existing structures, and copies of applicable federal or state permits.
- What information does the permit request?
- The form asks for facility locations, owner and contractor contact details, insurance certificate information, a 24-hour contact, work dates and times, and the scope of work.
Need something notarized?
This Right-of-Way Construction Permit doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
