Tolleson, AZ · Maricopa County
Application for Hydrant Tap / Construction Water
Tolleson applicants use this application to request a hydrant meter and construction water for a project at a specified location.
What this form is
The City of Tolleson requires prospective hydrant meter users to meet its listed requirements before approval or issuance. The application asks for applicant and contact details, the water use and project name, hydrant location, requested dates, and a site plan showing the meter location. Applicants also sign to acknowledge the hydrant meter issuance policy.
Who needs it
A resident, business, or contractor seeking a hydrant meter and construction water for a project in Tolleson needs to complete this application.
How to submit it
Submit the application to Utility Billing at 9055 W. Van Buren St., Tolleson, AZ 85353, or email [email protected] or fax (623) 936-7117.
About notarization
No notary is required; the applicant signs and dates the form and policy, and the site plan and backflow certification are not described as sworn or notarized.
How to submit this form
- 1
Download The Application
Download the Hydrant Tap / Construction Water Application PDF.
- 2
Complete The Application
Enter applicant and contact information, project water use, hydrant location, and requested start and end dates; sign and date the form and policy.
- 3
Gather The Site Plan
Attach a site plan showing the requested meter location.
- 4
Submit To Utility Billing
Send the completed application and site plan to Utility Billing by the address, email, or fax listed on the form.
Frequently asked questions
- Do I need a notary for the Hydrant Tap / Construction Water Application?
- No. The applicant signs and dates the form and policy; the site plan and backflow certification are not described as sworn or notarized.
- How do I submit the Hydrant Tap / Construction Water Application?
- Submit it to Utility Billing at the address on the form, or use the listed email, [email protected], or fax, (623) 936-7117.
- What should I include with the application?
- Attach a site plan showing the meter location. The policy also says backflow must be certified on-site with a Water Department member present, and the certification document must be given to the department.
- What deposit does the form list?
- The form states that a required $1,000 deposit includes $200 that is non-refundable. It says the remaining $800 will be refunded after inspection and return of the meter in operable condition.