Bullhead City, AZ · Mohave County

No notary required

Manufactured Home, Factory Built Building and Special Event Installation Signatures Page

This required signatures page records owner and applicant details and acknowledgments for manufactured home, factory-built building, and special event installation permit applications.

What this form is

Bullhead City identifies this as a required signatures page for manufactured home, factory-built building, and special event installations. It asks for applicant and owner names, the installation address, installation type, and dated signatures from the owner or authorized agent and applicant. By signing, the parties acknowledge project requirements, plans control provisions, and inspection access.

Who needs it

Owners or authorized agents and applicants submitting an installation permit application for one of the listed project types need to sign this page.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the owner or agent and applicant sign and date it, and no notarized attachment or related step is mentioned.

How to submit this form

  1. 1

    Download The PDF

    Download the installation signatures page for the applicable installation permit application.

  2. 2

    Complete The Form

    Enter the applicant and owner names, installation address, and installation type.

  3. 3

    Gather Attachments

    The document does not specify attachments; check the related permit application for any additional requirements.

  4. 4

    Sign And Date

    Have the owner or authorized agent and applicant sign and date the page.

  5. 5

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the installation signatures page for?
It records applicant and owner details, installation type, and required signatures and acknowledgments for manufactured home, factory-built building, or special event installations.
Who needs to sign this page?
The owner or authorized agent and the applicant must sign and date the page. An agent signing for the owner states they have the owner's permission and authority.
Do I need a notary for the installation signatures page?
No. This document is signed without a notary; the owner or agent and applicant sign and date it, and no notarized attachment or related step is mentioned.
How do I submit the installation signatures page?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Manufactured Home, Factory Built Building and Special Event Installation Signatures Page doesn’t need a notary — but if you have another Bullhead City form that does, a commissioned online notary can help.