Eloy, AZ · Pinal County

No notary required

Manufactured Home / Park Model Permit Application & Submittal Checklist

This application and checklist helps property owners and their representatives submit permit materials for a manufactured home or park model in Eloy.

What this form is

The handout combines a building permit application with a checklist of plans, reports, and approvals for a manufactured home or park model installation. It asks for project, property, applicant, owner, and contractor information, and lists items such as a site plan, floor plan, construction documents, and fire district approval. The application also includes owner authorization and installation-related report forms.

Who needs it

Property owners or their authorized representatives seeking a permit for a manufactured home or park model installation in Eloy should use this application package.

How to submit it

The application lists the City of Eloy Building Safety address as 595 North C Street, Suite 102, Eloy, Arizona 85131. It does not state a submission method; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; the application and included owner authorization and reports provide signature and date lines.

How to submit this form

  1. 1

    Download The Application

    Download the manufactured home permit application and submittal checklist PDF.

  2. 2

    Complete The Application

    Provide the project, property, applicant, owner, and contractor information requested, and sign and date the application.

  3. 3

    Gather Required Submittals

    Use the checklist to gather plans, construction documents, owner authorization, and applicable clearances and approvals.

  4. 4

    Submit To The City

    The form lists the City of Eloy Building Safety address at 595 North C Street, Suite 102; check the city website for current submission details.

Frequently asked questions

What is the Manufactured Home / Park Model Permit Application?
It is a permit application package and submittal checklist for manufactured home or park model installations. It includes application, authorization, site plan, and report materials.
What materials does the checklist request?
The checklist names the home's serial number, size, and year; a completed residential permit application; owner authorization; site and floor plans; construction documents; and specified approvals when applicable.
Do I need a notary for the Manufactured Home / Park Model Permit Application?
No. This document is signed and dated without a notary; the included owner authorization and reports have signature and date lines.
How do I submit the Manufactured Home / Park Model Permit Application?
The application lists the City of Eloy Building Safety address as 595 North C Street, Suite 102, Eloy, Arizona 85131. Check the city website for current contact details and submission instructions.

Need something notarized?

This Manufactured Home / Park Model Permit Application & Submittal Checklist doesn’t need a notary — but if you have another Eloy form that does, a commissioned online notary can help.