Eloy, AZ · Pinal County
Manufactured Home / Park Model Permit Application & Submittal Checklist
This application and checklist helps property owners and their representatives submit permit materials for a manufactured home or park model in Eloy.
What this form is
The handout combines a building permit application with a checklist of plans, reports, and approvals for a manufactured home or park model installation. It asks for project, property, applicant, owner, and contractor information, and lists items such as a site plan, floor plan, construction documents, and fire district approval. The application also includes owner authorization and installation-related report forms.
Who needs it
Property owners or their authorized representatives seeking a permit for a manufactured home or park model installation in Eloy should use this application package.
How to submit it
The application lists the City of Eloy Building Safety address as 595 North C Street, Suite 102, Eloy, Arizona 85131. It does not state a submission method; check the city website for current contact details.
About notarization
This document is signed and dated without a notary; the application and included owner authorization and reports provide signature and date lines.
How to submit this form
- 1
Download The Application
Download the manufactured home permit application and submittal checklist PDF.
- 2
Complete The Application
Provide the project, property, applicant, owner, and contractor information requested, and sign and date the application.
- 3
Gather Required Submittals
Use the checklist to gather plans, construction documents, owner authorization, and applicable clearances and approvals.
- 4
Submit To The City
The form lists the City of Eloy Building Safety address at 595 North C Street, Suite 102; check the city website for current submission details.
Frequently asked questions
- What is the Manufactured Home / Park Model Permit Application?
- It is a permit application package and submittal checklist for manufactured home or park model installations. It includes application, authorization, site plan, and report materials.
- What materials does the checklist request?
- The checklist names the home's serial number, size, and year; a completed residential permit application; owner authorization; site and floor plans; construction documents; and specified approvals when applicable.
- Do I need a notary for the Manufactured Home / Park Model Permit Application?
- No. This document is signed and dated without a notary; the included owner authorization and reports have signature and date lines.
- How do I submit the Manufactured Home / Park Model Permit Application?
- The application lists the City of Eloy Building Safety address as 595 North C Street, Suite 102, Eloy, Arizona 85131. Check the city website for current contact details and submission instructions.
Need something notarized?
This Manufactured Home / Park Model Permit Application & Submittal Checklist doesn’t need a notary — but if you have another Eloy form that does, a commissioned online notary can help.
