Menifee, CA · Riverside County

No notary required

Pool & Spa Supplemental Information Form

This supplemental form collects pool, spa, equipment, utility-line, and additional-work details from applicants submitting a building application in Menifee.

What this form is

The form provides supplemental information for pool and spa work, including the scope, dimensions, type, equipment, electrical and gas lines, and any additional work. Menifee’s form states that setback approval from Planning is required before Building review, and that additional work must appear on the site plan and in the building application’s Description of Work. It also notes that outdoor sinks have special requirements from Eastern Municipal Water District.

Who needs it

Applicants submitting building plans for pool or spa work in Menifee use this form to provide project and equipment details.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This form is completed without a notary; it mentions no notarized attachment or sworn step, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Form

    Download the Pool & Spa Supplemental Information Form PDF.

  2. 2

    Complete The Project Details

    Provide the work scope, pool and spa details, equipment information, and utility-line details requested.

  3. 3

    Gather Additional Work Information

    Show additional work on the site plan and in the building application’s Description of Work; include details, manufacturer specifications, and construction plans.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What information does the Pool & Spa Supplemental Information Form request?
It asks about the work scope, pool and spa dimensions and types, lighting, heater, bonding, utility lines, and details of additional work.
Do I need a notary for the Pool & Spa Supplemental Information Form?
No. This form is completed without a notary, and it mentions no notarized attachment or sworn step; the signer just signs and dates it.
How do I submit the Pool & Spa Supplemental Information Form?
The form does not give submission instructions. Submit it to the city department named on the form and check the city website for current contact details.
Does pool or spa work require Planning approval before Building review?
The form says setback approval from Planning is required before Building review. It also says slides or structures over six feet tall need Planning approval before submittal to Building & Safety.

Need something notarized?

This Pool & Spa Supplemental Information Form doesn’t need a notary — but if you have another Menifee form that does, a commissioned online notary can help.