Galt, CA · Sacramento County
Structural Observer Designation Form
Project owners use this form to designate the firm or individual responsible for structural observation and identify the applicable observation items.
What this form is
The Structural Observer Designation Form identifies the project, owner, architect, engineer, and firm or individual responsible for structural observation. It lists observation items, and only checked items are marked as required. The owner signs and dates a declaration confirming the observer was hired; if the observer differs from the architect or engineer of record, that professional also signs and dates a designation declaration.
Who needs it
A project owner completing structural observation designation needs this form, with the architect or engineer of record signing when the observer is different.
How to submit it
The form lists the City of Galt Community Development Department, Building Division, at 495 Industrial Dr., Galt, CA 95632, and [email protected]; it does not state a submission method.
About notarization
This form is signed and dated without a notary; it lists no sworn or notarized attachment, so the owner and, when applicable, architect or engineer simply sign and date it.
How to submit this form
- 1
Download The Form
Download the Structural Observer Designation Form for the project.
- 2
Complete Project Details
Enter the project address, building permit number, work description, owner, architect, and engineer.
- 3
Identify Observation Items
Name the responsible firm or individual and check the structural observation items that apply.
- 4
Sign And Date
The owner signs and dates; the architect or engineer of record also signs and dates if the observer is different.
- 5
Contact The Building Division
The form lists the Building Division address and email, but does not specify a submission method.
Frequently asked questions
- What does the Structural Observer Designation Form identify?
- It identifies the project, owner, architect, engineer, designated structural observer, and structural observation items. Only checked observation items are marked as required.
- Who signs the designation form?
- The owner signs and dates the declaration confirming the listed observer was hired. If that observer is different from the architect or engineer of record, that professional also signs and dates a declaration.
- Do I need a notary for the Structural Observer Designation Form?
- No. The form has signature and date lines but no notary block or notarized attachment; the owner and, when applicable, architect or engineer simply sign and date it.
- How do I submit the Structural Observer Designation Form?
- The form lists the Community Development Department, Building Division, at 495 Industrial Dr., Galt, CA 95632, and [email protected], but does not specify how to submit it.
