Grover Beach, CA · San Luis Obispo County
Encroachment Permit Application
Property owners and contractors use this application to request permission for work in Grover Beach’s public right-of-way.
What this form is
Grover Beach requires an approved encroachment permit before any work in the public right-of-way. The application asks for project details, work scope, owner and contractor information, and a signature; required attachments include a site plan or drawing and insurance documents. The listed permit fee is $320, payable by cash, check, or credit card at City Hall.
Who needs it
Property owners or contractors planning work in Grover Beach’s public right-of-way must submit this application before starting work.
How to submit it
Email the completed application to [email protected] with all required attachments; the listed $320 fee is payable by cash, check, or credit card at Grover Beach City Hall.
About notarization
This application is signed and dated without a notary; the listed attachments are a site plan or drawing and insurance documents, with no sworn step specified.
How to submit this form
- 1
Download The Application
Download the Encroachment Permit Application PDF.
- 2
Complete The Application
Provide project, work scope, owner, and contractor details, then sign and date the application.
- 3
Gather Required Attachments
Include a site plan or drawing, a certificate of insurance, and proof of workers’ compensation insurance.
- 4
Email The Application
Email the completed application and attachments to [email protected]. The listed $320 fee is payable at City Hall.
Frequently asked questions
- Do I need a notary for the Encroachment Permit Application?
- No. The application calls for the applicant’s signature and date, not notarization. It lists a site plan or drawing and insurance documents as attachments.
- How do I submit the Encroachment Permit Application?
- Email the completed application and required attachments to [email protected]. The listed $320 fee is payable by cash, check, or credit card at Grover Beach City Hall.
- When do I need an approved encroachment permit?
- The application says an approved permit is required before any work in the public right-of-way. It warns that failing to secure approval will result in double permit fees.
- What attachments does the application require?
- The application lists a site plan or drawing, a certificate of insurance naming the City as additional insured, and proof of workers’ compensation insurance.
Need something notarized?
This Encroachment Permit Application doesn’t need a notary — but if you have another Grover Beach form that does, a commissioned online notary can help.
