Millbrae’s Building Division application lets owners, architects, engineers, or contractors request approval to use alternate materials, designs, or construction methods on a project.

What this form is

Use this application to request approval for an alternate material, design, or construction method for a project in Millbrae. It asks for project and building details, the subject of the alternative, the applicable code requirement, the proposed alternative, and justification; applicants must submit two copies of supporting documents, including plans.

Who needs it

Owners, architects, engineers, or contractors seeking approval for an alternate material, design, or construction method can submit this application.

How to submit it

Submit two copies of all documents, including plans, to the Community Development Department’s Building Division at 621 Magnolia Avenue, Millbrae, CA 94030. The form states a $534 fee is due upon submittal.

About notarization

This document is signed without a notary; it calls for owner, architect or engineer, and contractor signatures, and the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the alternate materials, design, or construction methods application.

  2. 2

    Complete The Application

    Enter project details and describe the alternative, applicable code requirement, proposal, and justification.

  3. 3

    Gather Supporting Documents

    Include two copies of all documents, including plans showing the proposed alternate; attachments must be 8½×11 or 11×17 inches.

  4. 4

    Submit To The Building Division

    Submit the application and two copies to the Community Development Department’s Building Division at 621 Magnolia Avenue, Millbrae, CA 94030.

Frequently asked questions

What does the alternate materials application request?
It requests approval to use an alternate material, design, or construction method and asks for project information, code requirements, the proposed alternative, and justification.
Who can submit this application?
The form provides signature fields for an owner, architect or engineer, and contractor. It requests approval for an alternative used on a project.
Do I need a notary for the alternate materials application?
No. This application is signed without a notary; it calls for owner, architect or engineer, and contractor signatures, and the signer just signs and dates it.
How do I submit the alternate materials application?
Submit two copies of all documents, including plans, to the Community Development Department’s Building Division at 621 Magnolia Avenue, Millbrae, CA 94030. The form states a $534 fee is due upon submittal.

Need something notarized?

This Application and Conditions of Approval for Alternate Materials – Design or Methods of Construction doesn’t need a notary — but if you have another Millbrae form that does, a commissioned online notary can help.