Carpinteria, CA · Santa Barbara County

No notary required

Affidavit and Certification to Implement Waste Management Plan

This form identifies a construction or demolition project and certifies that the property owner, authorized agent, or contractor will implement its Waste Management Plan.

What this form is

Carpinteria’s Construction and Demolition Debris Recycling Program uses this form for residential and non-residential construction projects within city limits. The signer selects the project type and certifies that a Waste Management Plan will divert at least 65% of materials; some project types also require a WMP Report for the Public Works Director. The form asks for the project address, project or permit number, contact details, signer information, signature, and date.

Who needs it

A property owner, authorized agent, or licensed contractor files this form for a covered construction or demolition project within Carpinteria city limits.

How to submit it

Sign and submit this form only to the Public Works Director. For project types requiring a WMP Report, submit the report to the Public Works Director upon project completion and/or before issuance of a Certificate of Occupancy.

About notarization

This form is signed and dated without a notary; no separate notarized attachment or sworn step is identified.

How to submit this form

  1. 1

    Download the Form

    Download the Affidavit and Certification to Implement Waste Management Plan.

  2. 2

    Complete the Project Details

    Enter the project address, project or permit number, phone number, and select the project type.

  3. 3

    Gather Any Required Report

    For project types that require it, prepare a WMP Report detailing how at least 65% diversion will be achieved.

  4. 4

    Sign and Submit

    Sign and date the form, then submit it only to the Public Works Director. Submit any required WMP Report to that director as directed on the form.

Frequently asked questions

Who fills out the Waste Management Plan affidavit?
A property owner, authorized agent, or licensed contractor completes the form for a covered residential or non-residential construction project within Carpinteria city limits.
Does every project need a WMP Report?
The form says a WMP Report is required for demolition, new construction, and additions, alterations, or tenant improvements of 1,000 square feet or greater. It says reports are not required for the other listed project types.
Do I need a notary for the Waste Management Plan affidavit?
No. This form is signed and dated without a notary; it identifies no separate notarized attachment or sworn step.
How do I submit the Waste Management Plan affidavit?
Sign and submit the form only to the Public Works Director. If your project requires a WMP Report, submit that report to the Public Works Director upon completion and/or before issuance of a Certificate of Occupancy.

Need something notarized?

This Affidavit and Certification to Implement Waste Management Plan doesn’t need a notary — but if you have another Carpinteria form that does, a commissioned online notary can help.