Greene County, GA · Greene County
Public Right of Way Utilities Permit Application
This application is for contractors and other applicants seeking a permit to install utilities in a public right of way in Greene County.
At a glance
- Issued by
- City of Greene County · Greene County, Greene County, Georgia
- Notarization
- Not required: file this form without a notary.
- Official source
- greenecountyga.gov
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
The application requests a permit for utility installation in a public right of way and asks for the road location, utility length, planned start date, and estimated work duration. Applicants must acknowledge requirements for a schematic and location map, utility marking, and, for contractors, a license copy, identification, and a current Certified Level I Blue Card. The form lists permit fees by utility length.
Who needs it
Contractors and other applicants planning utility installation in a Greene County public right of way should complete this permit application.
How to submit it
Submit it to the Greene County Building and Zoning Department at 1034 Silver Dr., Ste 103, Greensboro, GA 30642; the form also lists a telephone and fax number.
About notarization
This application is signed and dated without a notary; the signer just signs and dates it, and no notarized or sworn attachment is listed.
How to submit this form
- 1
Download the Application
Download the Public Right of Way Utilities Permit Application.
- 2
Complete the Application
Enter the road location, utility length, planned start date, duration, and applicant and contractor details; read and initial the listed statements.
- 3
Gather Required Documents
Include a construction schematic and location plat or map. Contractors must also provide a license copy, identification, and a current Certified Level I Blue Card.
- 4
Submit to the County
Submit the application to Greene County Building and Zoning at 1034 Silver Dr., Ste 103, Greensboro, GA 30642.
Frequently asked questions
- Do I need a notary for the Public Right of Way Utilities Permit Application?
- No. This application has a signature and date field but no notary block. The signer just signs and dates it; no notarized or sworn attachment is listed.
- How do I submit the Public Right of Way Utilities Permit Application?
- Submit the completed application to the Greene County Building and Zoning Department at 1034 Silver Dr., Ste 103, Greensboro, GA 30642. The form also lists telephone and fax details.
- What documents must accompany the application?
- The form calls for a schematic of the utility construction plans and a plat or map showing the facility in relation to the roadway, pavement, or curb. Contractors must also provide a license copy, identification, and a current Certified Level I Blue Card.
- What information does the application request?
- It asks for the road and general location, total utility length, planned work start date, approximate duration, and applicant and contractor contact information.
