Greene County, GA · Greene County

No notary required

Temporary Power/Tpole Authorization

Contractors or property owners complete this authorization to request temporary construction electricity at a permitted location in Greene County.

At a glance

Issued by
City of Greene County · Greene County, Greene County, Georgia
Notarization
Not required: file this form without a notary.
Official source
greenecountyga.gov
Blank form
Download the PDF
Catalogued
Machine-readable
JSON record · about the forms index

What this form is

This form authorizes Georgia Power, Rayle EMC, or Walton EMC to supply temporary construction electricity at the location listed. It asks for the date, location, permit number, contractor or owner, and signature. The form states that power is for construction only and will be disconnected within 10 days after the Certificate of Occupancy is issued.

Who needs it

A contractor or property owner seeking temporary construction electricity for a permitted location completes the form.

How to submit it

For a Rayle EMC or Walton EMC service order, email the signed form to the address printed for that utility. For Georgia Power, the form says to call its account number.

About notarization

This document is signed without a notary; the contractor or owner signs and dates it, and no notarized or sworn attachment is mentioned.

How to submit this form

  1. 1

    Download the Form

    Download the Temporary Power/Tpole Authorization for Greene County.

  2. 2

    Complete the Form

    Enter the date, location, permit number, and contractor or owner information, then sign.

  3. 3

    Contact Your Utility

    Follow the form's instructions for Georgia Power, Rayle EMC, or Walton EMC.

  4. 4

    Send the Signed Form

    For Rayle EMC or Walton EMC service, email the signed form to the utility address printed on it.

Frequently asked questions

What does the Temporary Power/Tpole Authorization do?
It authorizes Georgia Power, Rayle EMC, or Walton EMC to supply temporary construction electricity at the location identified on the form.
Who completes the temporary power form?
The form requests the contractor or owner's name and signature, along with the location and permit number for the construction site.
How do I submit the Temporary Power/Tpole Authorization?
For a Rayle EMC or Walton EMC service order, email the signed form to the address printed for that utility. For Georgia Power, call the account number listed on the form.
Do I need a notary for the Temporary Power/Tpole Authorization?
No. This document is signed without a notary; the contractor or owner signs and dates it, and no notarized or sworn attachment is mentioned.