Fulton County, IL · Fulton County
Energy Storage Systems Addendum
This addendum collects project and applicant details for energy storage systems and is filed with a Conditional Use Permit Application and Zoning Permit Application.
At a glance
- Issued by
- City of Fulton County · Fulton County, Fulton County, Illinois
- Notarization
- Not required: file this form without a notary.
- Official source
- fultoncountyil.gov
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
This addendum records details about an energy storage or battery energy storage system, including its owner, operating date, configuration, capacity, enclosures, battery composition, and applicant. The document says it must be completed in its entirety and included with the Conditional Use Permit Application and Zoning Permit Application upon their individual filings; otherwise, the application is incomplete.
Who needs it
Applicants filing a Conditional Use Permit Application and Zoning Permit Application for an energy storage system must complete and include this addendum.
How to submit it
Include the completed addendum with the Conditional Use Permit Application and Zoning Permit Application upon their individual filings. The document does not name a county department or provide an address, email, portal, or fee.
About notarization
This addendum is signed and dated without a notary; it does not mention any notarized or sworn attachment or related step.
How to submit this form
- 1
Download the Addendum
Download the Energy Storage Systems Addendum PDF.
- 2
Complete the Form
Fill out the owner, project, system, and applicant information, then sign and date the form.
- 3
Gather Permit Applications
Prepare the Conditional Use Permit Application and Zoning Permit Application for their individual filings.
- 4
File the Addendum
Include the completed addendum with each permit application upon its individual filing.
Frequently asked questions
- What does the Energy Storage Systems Addendum ask for?
- It requests facility owner and applicant information, projected operation date, system configuration and capacity, storage duration, number of enclosures and batteries, and battery composition.
- When do I file this addendum?
- The document says to include the completed addendum with the Conditional Use Permit Application and Zoning Permit Application upon their individual filings.
- Do I need a notary for the Energy Storage Systems Addendum?
- No. The addendum is signed and dated without a notary, and it does not mention a notarized or sworn attachment or related step.
- How do I submit the Energy Storage Systems Addendum?
- Include it with the Conditional Use Permit Application and Zoning Permit Application upon their individual filings. The document does not provide a submission address or contact details.
