Pontoon Beach, IL · Madison County

No notary required

Development Permit Application

Property owners and project applicants use this application to request a Pontoon Beach development permit and provide project, drainage, and construction information.

What this form is

The application requests a development permit for proposed development or redevelopment in Pontoon Beach. It asks for applicant, owner, contractor, engineer, and project details, along with property and drainage information. Applicants must attach professionally prepared construction plans and supporting documents, including drainage plans, calculations, and environmental-feature information; the form also lists other required attachments and a filing fee.

Who needs it

Property owners or other applicants proposing development or redevelopment in Pontoon Beach use this application to request a development permit.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document has no notary block; although the applicant certifies the information “on my oath,” the form directs the applicant to sign and date it.

How to submit this form

  1. 1

    Download The Application

    Download the Development Permit Application PDF.

  2. 2

    Complete The Applicant Sections

    Provide applicant, owner, contractor, engineer, consultant, property, and proposed development information.

  3. 3

    Gather Required Attachments

    Attach professionally prepared plans and the supporting documents listed in the application, including drainage and environmental information.

  4. 4

    Submit To The City

    Submit the completed application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Development Permit Application?
No. The document has no notary block. It includes an applicant certification made “on my oath,” and directs the applicant to sign and date the form.
How do I submit the Development Permit Application?
The form does not specify a submission method. Submit it to the city department named on the form; check the city website for current contact details.
What information and plans does the application ask for?
It asks for applicant and project details, property information, drainage and land-disturbance details, and professionally prepared construction plans and supporting documents.
What attachments are listed with the application?
The checklist includes a legal description, project calculations, engineer certification, topography and drainage maps, environmental-feature information, and acknowledgment of inspection requirements.

Need something notarized?

This Development Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.