Meagher County, MT · Meagher County
Septic Permit Application and Pre-Septic Checklist
Meagher County property owners or their agents use this packet to apply for a subsurface wastewater permit and prepare the required supporting information.
At a glance
- Issued by
- City of Meagher County · Meagher County, Meagher County, Montana
- Notarization
- Not required: file this form without a notary.
- Official source
- meagherco.com
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
The packet includes a pre-application checklist, septic permit application, site plan layout, site evaluation report, and installer’s report. Applicants are directed to submit the completed application with the Soil Profile and proposed Site Report to the Clerk & Recorder’s Office, with the applicable permit fee. The checklist covers preliminary contacts and site preparation; work cannot begin until the completed application and fee are received and a permit to construct is issued.
Who needs it
Property owners or agents planning a new, replacement, upgrade, or other listed subsurface wastewater system project in Meagher County need this packet.
How to submit it
Submit the completed application with the Soil Profile and proposed Site Report to the Clerk & Recorder’s Office; the applicable permit application fee is due then.
About notarization
This document is signed without a notary; the applicant and property owner sign and date the form, and no notarized or sworn attachment is specified.
How to submit this form
- 1
Download the Packet
Download the septic permit application packet and pre-septic checklist.
- 2
Complete the Application
Fill out the application and provide the requested property, applicant, installer, and system information.
- 3
Prepare Supporting Documents
Include the Soil Profile and proposed Site Report, and complete the requested site plan and evaluation information.
- 4
Submit to the County
Submit the completed application and supporting documents to the Clerk & Recorder’s Office with the applicable permit application fee.
Frequently asked questions
- What does the Meagher County septic permit packet include?
- It includes a pre-septic checklist, permit application, site plan layout, site evaluation report, and installer’s report.
- How do I submit the septic permit application?
- Submit the completed application with the Soil Profile and proposed Site Report to the Clerk & Recorder’s Office. The applicable permit application fee is due at that time.
- Do I need a notary for the septic permit application?
- No. This document is signed without a notary; the applicant and property owner sign and date the form, and no notarized or sworn attachment is specified.
- Can septic system installation begin before the permit is issued?
- No. The checklist says work may not begin until the completed wastewater system application and applicable fee have been received and a permit to construct has been issued.
