Margate City, MT · Atlantic County

No notary required

Floodplain Development Permit Application

Margate City’s Floodplain Development Permit Application is for property owners, contractors, or developers proposing work in a designated floodplain.

What this form is

The application lets Margate City evaluate proposed development in regulated floodplains and Special Flood Hazard Areas. A permit is required before work begins on development within a designated floodplain. Applicants provide property, owner, contractor, project, and valuation details; the packet also lists required and potentially required supporting documents, including a site plan, elevation certificates, and project plans.

Who needs it

Property owners, contractors, or developers proposing development within a designated floodplain must apply before work begins.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; it lists supporting documents but does not say any must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Floodplain Development Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the property, owner, contractor, project, and valuation information requested.

  3. 3

    Gather Supporting Documents

    Include the required site plan, elevation certificates, and maps or plans; check the checklist for documents that may also be required.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Floodplain Development Permit Application?
No. The application has a signature and date line but no notary block. It lists supporting documents without saying they must be notarized or sworn.
Who should file this application?
Property owners, contractors, or developers proposing development within a designated floodplain should complete the application. The form requires a permit before work begins.
What documents are listed as supporting materials?
The checklist requires a site plan, elevation certificates, and maps or plans showing the development. It also lists additional documents that may be required, depending on the project.
How do I submit the application?
The document does not provide submission details. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Floodplain Development Permit Application doesn’t need a notary — but if you have another Margate City form that does, a commissioned online notary can help.