Mahwah, MT · Bergen County

No notary required

Municipal Sewer Hook-Up Application

This application supports a municipal sewer connection and is used by a homeowner or contractor completing the sewer hookup process.

What this form is

The document outlines steps and certifications for a sewer connection, including sewer and water charges, tax certification for new houses, and approvals needed before a permit is issued. It identifies related materials, including a plumbing tech sheet and a soil application, and says the Northwest Bergen Utilities sewer connection application must be completed and signed by the code official. It also describes health department steps for properties with an existing septic system.

Who needs it

A homeowner or contractor arranging a municipal sewer connection should use this application and complete the related steps described in the document.

How to submit it

Mail or take the two Northwest Bergen sewer connection forms to 30 Wyckoff Avenue, P.O. Box 255, Waldwick, New Jersey 07463. The document says required approvals and fee sign-offs must be obtained before a permit is issued.

About notarization

This document has no notary block and does not mention a sworn or notarized attachment; the signer completes the certification fields as indicated.

How to submit this form

  1. 1

    Download The Application

    Download the Municipal Sewer Hook-Up Application PDF.

  2. 2

    Complete The Form

    Complete the property location, block, lot, date, and applicable certification fields.

  3. 3

    Gather Related Materials

    Gather the plumbing tech sheet, soil application, required approvals, and Northwest Bergen sewer connection forms described in the document.

  4. 4

    Submit The Northwest Bergen Forms

    Mail or take the two Northwest Bergen forms to 30 Wyckoff Avenue, P.O. Box 255, Waldwick, New Jersey 07463.

Frequently asked questions

Do I need a notary for the Municipal Sewer Hook-Up Application?
No. This document has no notary block and does not mention a sworn or notarized attachment; complete the certification fields as indicated.
How do I submit the sewer connection forms?
Mail or take the two Northwest Bergen sewer connection forms to 30 Wyckoff Avenue, P.O. Box 255, Waldwick, New Jersey 07463.
What approvals are needed before a permit is issued?
The document lists a plumbing tech sheet approved by the plumbing inspector, soil approval, fee sign-offs, and a letter or email from Northwest Bergen confirming its fees are paid.
What if the property has an existing septic system?
The document says the homeowner or contractor must contact the Health Department and that the existing septic system must be inspected and closed out by the Health Department.

Need something notarized?

This Municipal Sewer Hook-Up Application doesn’t need a notary — but if you have another Mahwah form that does, a commissioned online notary can help.