Ridgewood, MT · Bergen County
2026 Site Grading and Stormwater Control Plan Checklist
Ridgewood property owners and contractors use this checklist to submit site grading and stormwater plan information for proposed construction or site improvements.
What this form is
This checklist accompanies a site plan for proposed work in Ridgewood and identifies the information to show, including existing and proposed conditions, drainage, landscaping, and erosion controls. A permit is required for specified work involving at least 200 square feet of impervious surface. The checklist also notes when soil permits or Bergen County Soil Conservation District certification are required and lists engineering review and site inspection fees.
Who needs it
Property owners and contractors proposing covered building, addition, pool, or site improvement work in Ridgewood should submit this checklist with a site plan.
How to submit it
Submit the checklist with a site plan of the proposed work. Send it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the signer just completes and dates the checklist, and no notarized or sworn attachment is mentioned.
How to submit this form
- 1
Download The Checklist
Download the 2026 Site Grading and Stormwater Control Plan Checklist.
- 2
Complete The Checklist
Enter the requested submission date, block and lot, owner and contractor details, and indicate deficient checklist items.
- 3
Prepare The Site Plan
Include a site plan of the proposed work with the information described in the checklist.
- 4
Submit To Ridgewood
Submit the completed checklist with the site plan to the city department named on the form.
Frequently asked questions
- What is the Ridgewood stormwater checklist for?
- It lists site plan details to provide for proposed work, including drainage, grading, landscaping, and erosion controls.
- Who should complete this checklist?
- Property owners and contractors proposing covered building, addition, pool, or site improvement work should submit it with a site plan.
- Do I need a notary for the Ridgewood stormwater checklist?
- No. This checklist is signed without a notary; the signer completes and dates it, and the document mentions no notarized or sworn attachment.
- How do I submit the Ridgewood stormwater checklist?
- Submit the checklist with a site plan of the proposed work. The form names the Department of Public Works Engineering Division; check the city website for current contact details.
