Floodplain Development Permit Application Form

Property owners and applicants use this application to request review of proposed development in a designated Special Flood Hazard Zone in Cape May Point.

What this form is

The application is for proposed development in a designated Special Flood Hazard Zone and must be submitted for review by the Borough of Cape May Point Floodplain Manager. It asks for applicant, builder, and engineer contact details; the project location and work description; estimated project cost; and signatures. Plans, surveys, cost estimates, and other supporting documents may also be required based on the project.

Who needs it

Applicants proposing development in a designated Special Flood Hazard Zone in Cape May Point should complete this application and submit it for review.

How to submit it

After completing Section 2, submit the forms in duplicate to the Borough of Cape May Point Floodplain Manager for review.

About notarization

This application is signed and dated without a notary; it identifies possible supporting documents but does not require any to be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Floodplain Development Permit Application Form.

  2. 2

    Complete Section 2

    Provide applicant and project contact details, the project location, a description of the work, and the estimated project cost.

  3. 3

    Gather Supporting Materials

    Include the project plans, survey, and cost estimate or other supporting documents that apply to the proposed development.

  4. 4

    Submit The Forms

    Submit the completed forms in duplicate to the Borough of Cape May Point Floodplain Manager for review.

Frequently asked questions

What is the Floodplain Development Permit Application for?
It requests review of proposed development in a designated Special Flood Hazard Zone in Cape May Point. The application collects project details and identifies information and supporting documents that may be required.
Who completes this application?
The applicant completes Section 2 with contact information, project location, proposed work, and estimated cost. The Floodplain Manager completes the floodplain determination section.
Do I need a notary for the Floodplain Development Permit Application?
No. The application is signed and dated without a notary. It identifies possible supporting documents, but does not require any to be notarized or sworn.
How do I submit the Floodplain Development Permit Application?
Complete Section 2 and submit the forms in duplicate to the Borough of Cape May Point Floodplain Manager for review, as directed on the application.

Need something notarized?

This Floodplain Development Permit Application Form doesn’t need a notary — but if you have another Cape May Point form that does, a commissioned online notary can help.