Cape May Point, MT · Cape May County

No notary required

Application for Connection to Water/Sewer System

Property owners or authorized agents use this application to request a water connection, sewer connection, or both from Cape May Point.

What this form is

This application requests a connection to the Borough’s water system, sewer system, or both, and lists the required fees for each option. The owner or authorized agent provides property details and signs and dates the form; licensed contractors provide their information and attach a license copy, proof of insurance, and a performance bond. A Street Opening Permit is also required.

Who needs it

Property owners or authorized agents seeking a water or sewer connection must complete the application and arrange for a licensed contractor to install the laterals.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; contractor attachments are a license copy, insurance proof, and performance bond, with no notarized step stated.

How to submit this form

  1. 1

    Download The Application

    Download the water/sewer connection application.

  2. 2

    Complete The Form

    Enter the property information, select the connection option, and provide owner or authorized agent and contractor details.

  3. 3

    Gather Contractor Attachments

    Attach each contractor’s license copy, proof of insurance, and performance bond.

  4. 4

    Submit To The City

    Submit the completed application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the water/sewer connection application request?
It requests a water connection, sewer connection, or both. The form collects property and contractor details and lists the applicable connection fees.
What must contractors attach?
For each listed contractor, attach a copy of the contractor’s license, proof of insurance for $500,000 in property damage and general liability, and a $500,000 performance bond.
Do I need a notary for the water/sewer connection application?
No. The application has signature and date fields but no notary block. Contractor attachments are a license copy, insurance proof, and performance bond; no notarized step is stated.
How do I submit the water/sewer connection application?
Submit it to the city department named on the form; check the city website for current contact details. The form says to request a meter and other necessary items from Public Works.

Need something notarized?

This Application for Connection to Water/Sewer System doesn’t need a notary — but if you have another Cape May Point form that does, a commissioned online notary can help.