Boonton Township, MT · Morris County

No notary required

Application for Zoning Permit for Construction or Site Development

Property owners and applicants use this application to request zoning review before construction or site development and before construction or tree removal permits are issued.

What this form is

The application requests zoning review for proposed construction or site development before construction and tree removal permits are issued. It asks for property and applicant details, the proposed use or structure, and information about lot area and setbacks. A property survey with setback information and basic construction plans must accompany the application, along with a sketch or plot plan showing the specified site details; the $50 fee must accompany it.

Who needs it

Applicants seeking zoning review for construction or site development should submit this application before construction or tree removal permits are issued.

How to submit it

Send the application to Township of Boonton, 155 Powerville Road, Boonton Twp., NJ 07005. The $50 application fee must accompany it.

About notarization

This application is signed and dated without a notary; the document does not identify any notarized or sworn attachment or related step.

How to submit this form

  1. 1

    Download The Application

    Download the zoning permit application PDF.

  2. 2

    Complete The Application

    Enter the applicant and property details, describe the proposed use or structure, and sign and date the application.

  3. 3

    Gather Required Materials

    Include a property survey with setback information, basic construction plans, and a sketch or plot plan showing the listed site details.

  4. 4

    Submit To The Township

    Send the application and $50 fee to Township of Boonton, 155 Powerville Road, Boonton Twp., NJ 07005.

Frequently asked questions

What does the Boonton Township zoning permit application request?
It requests zoning review for construction or site development and asks for applicant and property details, proposed work, and supporting survey and plan information.
What must accompany the zoning application?
Include a property survey showing setback information and basic construction plans, a sketch or plot plan with the listed site details, and the $50 application fee.
Do I need a notary for the zoning permit application?
No. This application is signed and dated without a notary, and it does not identify any notarized or sworn attachment or related step.
How do I submit the zoning permit application?
Send it to Township of Boonton, 155 Powerville Road, Boonton Twp., NJ 07005, with the $50 application fee.

Need something notarized?

This Application for Zoning Permit for Construction or Site Development doesn’t need a notary — but if you have another Boonton Township form that does, a commissioned online notary can help.