Boonton Township, MT · Morris County

No notary required

Application for Zoning Permit for Construction, Site Development, and Tree Removal

Boonton Township property owners or applicants use this application to request zoning review for construction, site development, or tree removal.

What this form is

This application requests zoning review for proposed construction, site development, or tree removal in Boonton Township. It asks for the property location, applicant and owner details, proposed use or structure, and information about tree removal. Attach a survey, sketch, or plot plan showing the lot, streets, structures, and distances to property lines; a building permit is still required before construction begins.

Who needs it

An applicant proposing construction, site development, or tree removal on property in Boonton Township needs this application for zoning review.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed without a notary; the applicant certifies the information is true and accurate by signing and dating it.

How to submit this form

  1. 1

    Download The Application

    Download the Boonton Township zoning permit application PDF.

  2. 2

    Complete The Application

    Enter the property location, applicant and owner details, proposed use or structure, and tree-removal information.

  3. 3

    Gather The Required Attachment

    Attach a survey, sketch, or plot plan showing the lot, streets, structures, and distances to property lines.

  4. 4

    Submit The Application

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Boonton Township zoning permit application?
No. The application has an applicant signature and date line, but no notary block. The applicant certifies the information is true and accurate by signing and dating it.
How do I submit the zoning permit application?
Submit it to the city department named on the form; check the city website for current contact details.
What should I attach to the application?
Attach a survey, sketch, or plot plan showing the lot size, bounding streets, existing and proposed structures, and distances to property lines.
Does zoning approval replace a building permit?
No. The form states that it is not a building permit and that a building permit must be obtained before construction begins.

Need something notarized?

This Application for Zoning Permit for Construction, Site Development, and Tree Removal doesn’t need a notary — but if you have another Boonton Township form that does, a commissioned online notary can help.