Roxbury, MT · Morris County
Right of Way Excavation Permit
Roxbury property owners and contractors use this application to request permission to excavate in the township’s right-of-way.
What this form is
This application requests a permit for excavation in the Township of Roxbury’s right-of-way. It asks for owner and contractor details, the work-site address, a work description, proposed dates, excavation dimensions, and existing surface information. The checklist says an application is incomplete without an approved zoning permit, two checks, a sketch plan, and the contractor’s insurance certificate; the application also includes a performance guarantee calculation and owner affidavit.
Who needs it
A property owner or contractor planning right-of-way excavation in Roxbury should complete this application and provide the listed supporting documents.
How to submit it
The checklist requires two checks payable to the Township of Roxbury, an approved zoning permit, a sketch plan, and the contractor’s insurance certificate. Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the owner and contractor sign and date the application, and no notarized attachment or sworn step is stated.
How to submit this form
- 1
Download The Application
Download the Right of Way Excavation Permit application.
- 2
Complete The Application
Fill in the owner, contractor, work-site, project, and excavation details, then sign and date the application.
- 3
Gather The Required Items
Include the approved zoning permit, two checks, a sketch plan, and the contractor’s insurance certificate.
- 4
Submit To The Township
Use the contact information for the Engineering Department on the form; check the city website for current submission details.
Frequently asked questions
- What is the Right of Way Excavation Permit application?
- It is an application for a Township of Roxbury permit to excavate in the right-of-way. It requests project, owner, contractor, and excavation details.
- What must I include with the application?
- The checklist calls for an approved zoning permit, two checks payable to the Township, a sketch plan showing the excavation purpose, and the contractor’s insurance certificate.
- Do I need a notary for the Right of Way Excavation Permit?
- No. This application is signed without a notary; the owner and contractor sign and date it, and no notarized attachment or sworn step is stated.
- How do I submit the Right of Way Excavation Permit application?
- The form lists the Township Engineering Department and its address. It does not give a submission method, so check the city website for current contact details.