Clifton, MT · Passaic County
Curb Permit Application
Property owners and contractors use this application to request a Clifton curb permit and review the city’s construction, inspection, and work requirements.
What this form is
The application requests a curb permit and asks for the date, homeowner’s name, property address, and contractor and phone information. It lists the $25 fee and construction requirements, including an inspection of forms before concrete is poured. The permit expires 90 days after issue, and the document says properties on county roads may also require county permits.
Who needs it
A homeowner or contractor planning curb work in Clifton should use this application to request a curb permit.
How to submit it
The form identifies the Division of Engineering at 900 Clifton Avenue. It does not give submission instructions; call 973-470-5793 to arrange the required inspection before pouring concrete.
About notarization
This document is signed without a notary; the permit is not valid unless signed by the City Engineer, and the form includes a date field.
How to submit this form
- 1
Download The Application
Download the Curb Permit Application PDF.
- 2
Complete The Application
Enter the date, homeowner’s name, property address, contractor, and phone number.
- 3
Arrange The Inspection
Call the Engineering Department at 973-470-5793 to arrange inspection after forms are in place and before pouring concrete.
- 4
Submit To The City
The form does not state how to submit the application; contact the Division of Engineering at 900 Clifton Avenue.
Frequently asked questions
- Do I need a notary for the Curb Permit Application?
- No. This document is signed without a notary; it is not valid unless signed by the City Engineer.
- How do I submit the Curb Permit Application?
- The form identifies the Division of Engineering at 900 Clifton Avenue but does not explain how to submit it. Call 973-470-5793 to arrange the required inspection before pouring concrete.
- What information does the application ask for?
- It asks for the date, homeowner’s name, property address, contractor, and phone number.
- When must the curb forms be inspected?
- Call the Engineering Department at 973-470-5793 after the forms are in place and before pouring concrete. The form says concrete cannot be poured without inspection and approval.
Need something notarized?
This Curb Permit Application doesn’t need a notary — but if you have another Clifton form that does, a commissioned online notary can help.