Warren Township, MT · Somerset County

No notary required

Driveway Construction Permit

Warren Township property owners or applicants use this application to request approval for driveway construction and submit required plans to the Engineering Department.

What this form is

The application requests driveway construction approval and asks for applicant, property owner, and plan preparer details, along with the block, lot, and street address. It says to file the application in the Engineering Department with a completed checklist and two topographic site plans; include a Department of Public Works road opening permit if applicable. The plans must show specified site features and grades.

Who needs it

Applicants seeking approval for driveway construction in Warren Township should complete this application and provide the required checklist and site plans.

How to submit it

File the application in the Engineering Department. The document lists a completed checklist and two topographic site plans as required submissions, and a road opening permit if applicable.

About notarization

This application has no notary block; it includes owner-consent language for cases where the owner differs from the applicant, and the form provides signature and date lines.

How to submit this form

  1. 1

    Download The Application

    Download the Driveway Construction Permit application and its attached checklist.

  2. 2

    Complete The Application

    Enter the applicant, owner, plan preparer, block, lot, and street address information, then sign and date the application.

  3. 3

    Gather Required Materials

    Include the completed checklist, two topographic site plans, and a road opening permit if applicable.

  4. 4

    File With Engineering

    File the application and required materials in the Warren Township Engineering Department.

Frequently asked questions

Do I need a notary for the Driveway Construction Permit?
No notary block appears on this application. It includes owner-consent language when the owner differs from the applicant, with signature and date lines.
How do I submit the Driveway Construction Permit?
File the application in Warren Township's Engineering Department with the completed checklist and two topographic site plans. Include a road opening permit if applicable.
What plans are required with the application?
The document calls for two topographic site plans prepared by a professional engineer, architect, or licensed land surveyor, with specified grades, site features, and other details.

Need something notarized?

This Driveway Construction Permit doesn’t need a notary — but if you have another Warren Township form that does, a commissioned online notary can help.