Mountainside, MT · Union County

No notary required

Road Opening Permit Application

This application requests a permit for road opening work and is completed by the applicant responsible for the proposed construction.

What this form is

Use this application to request a permit for road opening work, including sewer connections, curb or driveway construction, sidewalk repair, and utility installation or repair. It asks for the opening address, block and lot, purpose, and applicant and owner contact details; the form also lists a $500 permit fee, bond requirements, inspection requirements, and construction specifications.

Who needs it

An applicant proposing road opening work, such as a sewer connection, sidewalk repair, or utility installation, should complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application has no notary block; the applicant signs it, and the document mentions no notarized attachment or sworn step.

How to submit this form

  1. 1

    Download The Application

    Download the Road Opening Permit Application PDF.

  2. 2

    Complete The Application

    Provide the road opening address, block and lot, purpose, and applicant and owner contact details; sign the application.

  3. 3

    Review Requirements

    Review the listed fee, bond terms, inspection requirements, and construction specifications.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Road Opening Permit Application?
No. This application has no notary block; the applicant signs it, and the document mentions no notarized attachment or sworn step.
How do I submit the Road Opening Permit Application?
The form does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
What road opening work does the application cover?
Listed purposes include sanitary sewer house connections, curb or driveway construction, sidewalk repair, utility installation or repair, and other work.
What does the application say about inspections?
It requires specified inspections before backfill, concrete pours, or curb construction. Inspection requests must be made at least 24 hours in advance.

Need something notarized?

This Road Opening Permit Application doesn’t need a notary — but if you have another Mountainside form that does, a commissioned online notary can help.