Westfield, MT · Union County

No notary required

Sidewalk Permit Installation, Repair or Alteration

This permit application is for people seeking permission to install, repair, or alter a sidewalk in Westfield.

What this form is

Use this permit to request permission for sidewalk installation, repair, or alteration at a specified address. It asks for the applicant’s name, email, and phone number, the work location, and a location sketch or description; it also includes fields for the date, permit number, check number, inspection date, and approval.

Who needs it

Anyone seeking permission to install, repair, or alter a sidewalk at an address in Westfield should complete this permit.

How to submit it

Email Chris Roth in the Engineering Office at [email protected] to schedule an inspection 24 to 48 hours before the sidewalk is poured.

About notarization

This permit is completed without a notary; no notarized attachment or related step is stated, and the form includes a date and approval field.

How to submit this form

  1. 1

    Download The Permit

    Download the Westfield sidewalk permit PDF.

  2. 2

    Complete The Form

    Provide your name, email, phone number, and the sidewalk work address.

  3. 3

    Attach Location Details

    Attach a sketch of the location or provide a description, as requested on the form.

  4. 4

    Schedule An Inspection

    Email Chris Roth in the Engineering Office to schedule an inspection 24 to 48 hours before the sidewalk is poured.

Frequently asked questions

What work does the Westfield sidewalk permit cover?
The permit is for sidewalk installation, repair, or alteration at a specified address.
What information does the application ask for?
It requests the applicant’s name, email, phone number, work address, and a location sketch or description.
Do I need a notary for the Westfield sidewalk permit?
No. This permit is completed without a notary, and it does not state that an attachment or related step must be notarized.
How do I submit the sidewalk permit?
The form directs applicants to email Chris Roth in the Engineering Office to schedule an inspection 24 to 48 hours before the sidewalk is poured.

Need something notarized?

This Sidewalk Permit Installation, Repair or Alteration doesn’t need a notary — but if you have another Westfield form that does, a commissioned online notary can help.