Dutchess County, NY · Dutchess County

No notary required

Engineering Report for Swimming Pool Plans

This engineering report records swimming pool design and operating details for an engineer or architect submitting plans to the Dutchess County Health Department.

At a glance

Issued by
City of Dutchess County · Dutchess County, Dutchess County, New York
Notarization
Not required: file this form without a notary.
Official source
dutchessny.gov
Blank form
Download the PDF
Catalogued
Machine-readable
JSON record · about the forms index

What this form is

Use this report to supplement the narrative report when transmitting swimming pool plans to the Health Department. It covers pool configuration, bather capacity, water supply, equipment, waste disposal, safety features, and other design details. The form also requests the designing engineer’s or architect’s signature, date, address, license number or seal, and telephone number.

Who needs it

An engineer or architect submitting swimming pool plans to the Health Department uses this report to describe the pool’s design and operation.

How to submit it

The form says it supplements the narrative report in the transmittal of plans to the Health Department. Submit it to the county department named on the form; check the county website for current contact details.

About notarization

This document is signed without a notary; the designing engineer or architect signs and dates the report, and no notarized or sworn attachment is specified.

How to submit this form

  1. 1

    Download the Report

    Download the Engineering Report for Swimming Pool Plans PDF.

  2. 2

    Complete the Pool Details

    Fill in the sections that describe the pool, equipment, water supply, safety features, and other design information.

  3. 3

    Gather the Plans and Report

    Prepare the narrative report and plans the form is intended to accompany; include indicated supporting material as applicable.

  4. 4

    Sign and Submit

    Have the designing engineer or architect sign and date the report, then transmit it with the plans to the Health Department.

Frequently asked questions

What is the Engineering Report for Swimming Pool Plans?
It records pool design and operating information and is intended to supplement the narrative report when an engineer or architect transmits swimming pool plans to the Health Department.
Who completes this swimming pool report?
The report requests information about the pool and its systems, plus the signature, date, address, license number or seal, and telephone number of the designing engineer or architect.
Do I need a notary for the Engineering Report for Swimming Pool Plans?
No. The designing engineer or architect signs and dates the report; it does not specify a notarized or sworn attachment.
How do I submit the swimming pool engineering report?
The form says to use it with the narrative report in the transmittal of plans to the Health Department. Check the county website for current department contact details.

Need something notarized?

This Engineering Report for Swimming Pool Plans doesn’t need a notary, but if you have another Dutchess County form that does, a commissioned online notary can help.