Dutchess County, NY · Dutchess County
Engineering Report for Swimming Pool Plans
This engineering report records swimming pool design and operating details for an engineer or architect submitting plans to the Dutchess County Health Department.
At a glance
- Issued by
- City of Dutchess County · Dutchess County, Dutchess County, New York
- Notarization
- Not required: file this form without a notary.
- Official source
- dutchessny.gov
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
Use this report to supplement the narrative report when transmitting swimming pool plans to the Health Department. It covers pool configuration, bather capacity, water supply, equipment, waste disposal, safety features, and other design details. The form also requests the designing engineer’s or architect’s signature, date, address, license number or seal, and telephone number.
Who needs it
An engineer or architect submitting swimming pool plans to the Health Department uses this report to describe the pool’s design and operation.
How to submit it
The form says it supplements the narrative report in the transmittal of plans to the Health Department. Submit it to the county department named on the form; check the county website for current contact details.
About notarization
This document is signed without a notary; the designing engineer or architect signs and dates the report, and no notarized or sworn attachment is specified.
How to submit this form
- 1
Download the Report
Download the Engineering Report for Swimming Pool Plans PDF.
- 2
Complete the Pool Details
Fill in the sections that describe the pool, equipment, water supply, safety features, and other design information.
- 3
Gather the Plans and Report
Prepare the narrative report and plans the form is intended to accompany; include indicated supporting material as applicable.
- 4
Sign and Submit
Have the designing engineer or architect sign and date the report, then transmit it with the plans to the Health Department.
Frequently asked questions
- What is the Engineering Report for Swimming Pool Plans?
- It records pool design and operating information and is intended to supplement the narrative report when an engineer or architect transmits swimming pool plans to the Health Department.
- Who completes this swimming pool report?
- The report requests information about the pool and its systems, plus the signature, date, address, license number or seal, and telephone number of the designing engineer or architect.
- Do I need a notary for the Engineering Report for Swimming Pool Plans?
- No. The designing engineer or architect signs and dates the report; it does not specify a notarized or sworn attachment.
- How do I submit the swimming pool engineering report?
- The form says to use it with the narrative report in the transmittal of plans to the Health Department. Check the county website for current department contact details.
