Solid Fuel Unit and Chimney Inspection Schedule

Wyoming County property owners or contractors use this schedule to acknowledge required solid fuel and chimney inspections and arrange each inspection.

At a glance

Issued by
City of Wyoming County · Wyoming County, Wyoming County, New York
Notarization
Not required: file this form without a notary.
Official source
wyomingcountyny.gov
Blank form
Download the PDF
Catalogued
Machine-readable
JSON record · about the forms index

What this form is

This schedule lists required inspections for solid fuel units and chimneys, including inspection points during construction and installation. The signer agrees to call 24 hours in advance for each required inspection; the document also includes a building permit application and an intake checklist. A Certificate of Compliance must be issued before a solid fuel unit is used.

Who needs it

Property owners or contractors applying for a building permit involving a solid fuel unit or chimney use this schedule to acknowledge inspection requirements.

How to submit it

Submit the building permit application in duplicate to the Wyoming County Building Department, Agricultural & Business Center, 36 Center Street, Suite C, Warsaw, NY 14569. The document lists [email protected] and says to call 585-786-8820 at least 24 hours ahead for inspections.

About notarization

This document is signed without a notary; the signer just signs and dates it.

How to submit this form

  1. 1

    Download the Form

    Download the solid fuel unit and chimney inspection schedule and building permit application.

  2. 2

    Complete the Form

    Fill in the requested project and applicant information, then sign and date the inspection schedule and application.

  3. 3

    Gather Attachments

    Include a plot plan, two sets of construction drawings, and two sets of specifications as directed by the application.

  4. 4

    Submit to the County

    Submit the application in duplicate to the Wyoming County Building Department at the address shown on the form.

Frequently asked questions

Do I need a notary for the solid fuel inspection schedule?
No. This document is signed without a notary; the signer just signs and dates it.
How do I submit the solid fuel inspection schedule?
Submit the building permit application in duplicate to the Wyoming County Building Department at 36 Center Street, Suite C, Warsaw, NY 14569.
When should I call to schedule an inspection?
The document says the owner or contractor must call at least 24 hours in advance for each required inspection. It lists 585-786-8820 for calls.
When can a solid fuel unit be used?
The document says a Certificate of Compliance must be issued before any solid fuel unit is used.