What this form is
This application is required for all work in the Town-maintained right-of-way. It asks for applicant and contractor contacts, the project location and reason for the work, and details such as excavation area, pavement cuts, and anticipated dates. Applicants indicate whether plans or shop drawings are submitted and provide a location sketch; the Public Works Department completes the permit and work-acceptance sections.
Who needs it
Applicants, contractors, and utility companies planning work in a Town-maintained right-of-way need to complete this application.
How to submit it
Send the completed application to the Town of Hope Mills Public Works Department at [email protected]; the form also lists 910-429-3387.
About notarization
This application is signed and dated without a notary; include a location sketch and, when applicable, construction plans or a sketch and material shop drawings.
How to submit this form
- 1
Download the Application
Download the Right-of-Way Use Permit Application for work in a Town-maintained right-of-way.
- 2
Complete the Application
Fill in applicant and contractor contacts, project location, reason for the work, construction details, and anticipated dates.
- 3
Gather Project Attachments
Provide a location sketch and indicate whether construction plans or a sketch and material shop drawings are submitted, as applicable.
- 4
Send It to Public Works
Send the completed application to [email protected].
Frequently asked questions
- Do I need a notary for the Right-of-Way Use Permit Application?
- No. The application has a signature and date line but no notary block. Include a location sketch and, when applicable, construction plans or a sketch and material shop drawings.
- Who should complete this application?
- The applicant should complete it for work in a Town-maintained right-of-way. If a contractor is the applicant, the form asks them to note that and provide applicable contact information.
- What project information does the application request?
- It requests applicant and contractor details, the project location and reason for the work, construction activity, excavation and pavement-cut dimensions, anticipated start date and duration, and plan-submission details.
- How do I submit the Right-of-Way Use Permit Application?
- Send the completed application to the Town of Hope Mills Public Works Department at [email protected]. The form also lists 910-429-3387.
Need something notarized?
This Right-of-Way Use Permit Application doesn’t need a notary — but if you have another Hope Mills form that does, a commissioned online notary can help.